Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Nov 10, 2010     Wiring; Avionics rack; Misc. - (4.3 hours) Category: Electrical
Did a bunch of miscellaneous tasks today, most of which relate to electrical stuff (which is why I filed this entry under that category...)

1. Drilled more holes in the under-floor bulkheads and spar, and installed grommets.
2. Ran autopilot servo harness a bit further though the fuselage.
3. Prepped the two magnetometer harnesses for installation.
4. Drilled for nutplates for the right side map pocket. (Most of these nutplates will be in the fuselage, with two in the right vertical channel cap.)
5. Sanded, prepped and primed the channel cap and the map pocket itself.
6. Deburred and prepped the final components of the avionics rack, in preparation for anodizing.
7. Prepped fuselage for installation of both comm antennas.

I also spent some time trying to figure out where and how I'm going to mount the small antenna for the Monroy ATD-300 Traffic Watch unit. It's a stick-type transponder antenna, and it needs to go forward of the wing, on the belly someplace. [Superseded.]
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.